The effect of serial correlation on the in-control average run length of cumulative score charts

Walter Böhm, Peter Hackl

Publikation: Wissenschaftliche FachzeitschriftOriginalbeitrag in FachzeitschriftForschungBegutachtung

Abstract

The cumulative sum (CUSUM) technique is well-established in theory and practice of process control. For a variant of the CUSUM technique, the cumulative score chart, we investigate the effect of serial correlation on the in-control average run length (ARL). The Shewhart chart is a special case of the cumulative score chart. Using the fact that the cumulative score statistic is a correlated random walk with a reflecting and an absorbing barrier, we derive an approximate but closed-form expression for the ARL of a control variable that follows a first-order autoregressive process with normally distributed disturbances. We also give an expression for the asymptotic (large in-control ARL) case. Our method of approximation gives ARL values that are in good agreement with Monte Carlo estimates of the true values. For positive serial correlation the ARL decreases with increasing value of the correlation coefficient. For …
OriginalspracheEnglisch
Seiten (von - bis)15-30
Seitenumfang16
FachzeitschriftJournal of Statistical Planning and Inference
Jahrgang54
Ausgabenummer1
DOIs
PublikationsstatusVeröffentlicht - 1996

Zitat